Services

Achintyaa Enviro Solutions Pvt Ltd

Pre-Processing Facility- Why??

➢ Waste generation is bound to increase with “make in India” need, growth of population and improvement in quality of life.
➢ Neither generators nor cement companies are happy with direct co-processing asitislargely not sustainable.
➢ Present Method of “Treatment and Disposal” is not sustainable and highly Risky.
➢ Need to minimizethe Incinerationand Landfill waste based on merit
➢ DirectCo-processing has Limitationand is not sustainable.
➢ Illegal disposal by the transporter by using names
➢ There are lots many ways are available even after existing recycle / reuse practices.

Benefits Of Pre-Processing Facility

➢ Most of the waste are not suitable for direct utilizations in cement kilns.
➢ Cement plants needs consistent supply of uniform quality of “Waste Materials” as fuel.
➢ Ensures consistency in waste quality & emission, uniform operation.
➢ It avoids large variation in physical and chemical characteristics of waste leading to;
    ▪Difficulties in unloading , Storage, Feeding
    ▪Process Disturbance, Product Quality Disturbance
    ▪Emission Disturbance
    ▪Legal Compliances, Safety Issues
➢It ensures safe and healthy condition cement plant.
➢It ensures “full proof” hazardous waste tracking.

Pre Processing Facility    

Hazardous Waste Pre-Processing Facility

Key Component
1. Collection, Storage And Processing Of Liquid And Solid Hazardous Waste
2. Collection, Storage And Processing Of Solid Incinerable Municipal Waste
3. Mixing Of Compatible Incinerable Waste Material And Preparation Of Quality Fuel.
4.Separate Storage Of Liquid And Solid Fuel
5. Laboratory For Quality Analysis And Quality Control
6.Transportation And Logistic Facility For Supply Waste To Cement Plant
7. Experience Technical Person And Trained Manpower For Handling Of Hazardous Waste
8.Networking With Hazardous Waste Supplier And End User Cement Plant

Strategy For Fuel Production

   

Transformation In Waste Management

Fuel From Solid Wastes